Available a project for the construction of a 27.8 MW solar power station is on sale.
Area of the territory – 60.7 ha
Location – Dnipro region (out of settled areas – there are no restrictions in use).
Land status – rent (49 years).
Solar Solids – 1 140 sq./year
The connection point
35/10 kV Substation
Current stage:
– pre-PPA;
– declaration of the start of construction work.
The site is ready for the design and construction of the station.