Available a project for the construction of a 75 MW solar power station is on sale.
Area of the territory – 150 ha
Location – Poltava region
Land status – rent (49 years)
Annual radiation – 1,050 kWh/kWp/year
Annual Electricity Generation – 78,809,800 kWh
The connection point
150/10 kV substation; length – 800 m
Grid Connection and Technical Conditions – SIGNED
Land Lease Agreement – SIGNED
The site is ready for the design and construction of the station