Total land area – 26,5 ha
Descriptions of SPP:
- Total rated power – 11 MW;
- Irradiation – 1100 kW/m² per year;
- Efficiency – 12 GW/h per year.
IRR – 20%
Point of connecting – 35 kW at distance up to 2000 m from the construction site.
Availability of labor resources.