The project aim is building of new brick factory, in a complex with opening of two clay open-cast mines and one sandy.
In the project of construction of brick it is planned under one roof to establish two lines on brick production:
- 1st line will make an ordinary building brick in quantity of 60 million piece a year.
- 2nd line will make a facing brick in quantity of 15 million piece of bricks a year.
The brick factory will be output following production:
- Facing hollow brick, red;
- Facing hollow brick, in color;
- The block building ceramic porous, size 220х250х400;
- The block building ceramic porous, size 220х250х500;
- Planned capacity of brick-works: 75 million piece of bricks a year.
Internal norm of yield (IRR) – 13,1 %.
The discounting rate: 10 %.
Return of Equity (ROE) – 19,36%